Thai Binh 1 Thermal Power Plant use conventional condensing technology with Subcritical pressure boilers, which has been a widely applied worldwide. The modern powerhouse technology meet strict demands for environmental protection...
1. General
Name of project: | Thai Binh 1 Thermal Power Plant |
Investor : | Vietnam Electricity/Power Generation Corporation 1 |
Project manager: | Thai Binh Thermal Power Project Management Board |
Project location: | My Loc Commune, Thai Thuy District, Thai Binh Province |
Total investment: | VND 26,500 billion |
Investment sources: | ODA (85%), EVN’s reciprocal capital (15%) |
Project scale: | 600MW |
Number of units: | 02 x 300MW |
Annual Output: | 52 million kWh |
Thai Binh 1 Thermal Power Plant use conventional condensing technology with Subcritical pressure boilers, which has been a widely applied worldwide. The modern powerhouse technology meet strict demands for environmental protection after Vietnamese and international criteria.
Power will be dispatched to the national grid through a 220kV double circuit transmission line from Thai Binh power center to 220kV Thai Binh Substation. After its operation the project will increase power supply capacity for socio-economic development of Hong River delta. The project will also help to reduce grid dependency to hydropower source, especially in dry seasons and dry years, and increase safety, stability, and economics of grid operation.
2. Schedule
( Source: http://en.evn.com.vn)
Or contact us:
+84 (0) 903 1800 99 - info@catminh.com