• Floor 5th, TEDI Building, No. 15A, Hoang Hoa Tham Street, Ward 6, Binh Thanh District, Ho Chi Minh, Viet Nam.
  • +84 (0) 903 1800 99 
  • info@catminh.com
    • ENERGY PROJECTS IN VIET NAM THAT CAT MINH PARTICIPATED 

    Vinh Tan 4 Expansion Thermal Power Plant

  • Thứ hai, 09:33 Ngày 09/04/2018 .
  • The project includes one unit in configuration of 01 boiler + 01 turbines + 01 generator. Technology applied in the project is supper critical steam parameters, which is widely applied worldwide. 

    1. General

          Name of project:        Vinh Tan 4 Expansion Thermal Power Plant
          Investor :        Vietnam Electricity
          Project manager:        Power Generation Corporation 3
          Project location:        Vinh Tan Commune, Tuy Phong District, Binh Thuan Province
          Total investment:        VND 24,000 billion
          Investment sources:        EPC contract
          Project scale:        600MW
          Number of units        01
          Annual Output:        3.6 billion kWh

     

    Vinh Tan 4 Thermal Power Expansion Plant will utilize existing infrastructures such as plan, port, grid connection, transportation etc., especially common systems shared with  Vinh Tan 4 Thermal Power Plant under construction.

    The project includes one unit in configuration of 01 boiler + 01 turbines + 01 generator. Technology applied in the project is supper critical steam parameters, which is widely applied worldwide. This method is the state-of-the-art with high capacity and efficiency, which accompanies with reasonable cost and meets strict Vietnamese criteria for environmental protection.

    After its operation the project will increase power supply capacity for socio-economic development of the Southern region and Southern part of Central region; reduce grid dependency to hydropower source, especially in dry seasons and dry years; reduce amount of power dispatched from the North to the South; reduce power losses; and increase safety, stability, and economics of grid operation.

    2. Schedule

    • Ground breaking ceremony: 23 April 2016
    • Commercial operation: April 2019

    (Source : evn.com.vn)

     

    BÀI VIẾT LIÊN QUAN1

    TOP
  • GỬI
  • Enter your phone number for advice!

  • Or contact us:
    +84 (0) 903 1800 99  - info@catminh.com